What to Expect With New Deck Construction Projects

Deciding to start new deck construction is a very exciting time! This is an upgrade that will provide your family with many years of happy memories. The goal of the SEAL-A-DECK team is to work with you to provide detailed, aesthetically pleasing, and budget-friendly options for your new deck. Here’s the process you can expect from us, from initial consultation to project completion.
New Deck Planning
Our team is ready to help from the moment you decide to start planning your new deck project. If this is your first outdoor living space construction, you may have many questions. Each SEAL-A-DECK project comes with a planning meeting prior to starting any of the measuring and building. In this meeting, we will cover your budget, material and design preferences, and what you have in mind for the outdoor space. No two decks are the same. You may want a pergola, furniture or lighting to enhance your deck. We will cover all of these upon our initial meeting. You will pick the features that fit your needs as well as determine how to build with room to grow in amenities (if you so desire). Once the design is solidified, we will talk about all of the material options such as pine, cedar, composite, or even PVC. The choice is yours and we will detail the pros and cons of each choice so that you completely understand what you’re getting.
READ MORE: Which Type of Deck Material Should I Use for My Deck Project?
Construction Begins
Once we decide on the best time for construction to begin, you can expect professional and meticulous service from the first board laid to the final nail. We will obtain any and all required permits ahead of time and have your materials bought and ready to go. The foundation, or frame, will mark the beginning of the construction project. While the frame is being built, we will lay out the area for the posts and remove any materials needed in the most eco-friendly way possible. SEAL-A-DECK proudly delivers environmentally safe practices and waste-reducing measures. After we get the frame up, you will then see posts, railing, and stairs with minimal disturbance to the area possible. The average time from beginning to completion is one to three weeks depending on the size of the project.
READ MORE: Simple Ways to Customize Your Deck
Finishing Touches
The fun is in the details. We love getting lighting and amenity options installed for our customers. There are so many things to consider when sprucing your deck up. We provide low voltage, energy-efficient solutions that focus on quality and durability for your lighting needs all year-round. Also, we specialize in outdoor kitchen areas perfect for hosting. This can include countertops, grills, and eating space. If you like to get cozy by the fireplace in the cooler months, we have got that covered too. Your imagination is the only limit to what we can achieve together.
We’ve Got You Covered
SEAL-A-DECK has served the Boston area as well as Cape Cod, South New Hampshire, and Rhode Island for many years. We know how important these outdoor living spaces are. Our team will work with you to get your new deck construction completed with all the things you want. Give us a call today at 1-877-SEALADECK or complete our instant quote to get information directly in your inbox.